|
|
 |
| |
|
Media Release
|
| |
|
Monday, May 19, 2008
For Immediate Release
|
Contact: Debby Ackerman Telephone: 229-6581
|
| |
|
Summerlin Parkway Rehabilitation Continues
Paving Project To Add Third Westbound Travel Lane From U.S. 95 To Buffalo Drive
|
| |
|
An ambitious project to repave Summerlin Parkway is underway. Crews plan to work double shifts to complete the $2 million improvement project as quickly as possible.
Temporary traffic lane restrictions and temporary ramp closures can be expected as crews repave Summerlin Parkway from U.S. 95 near Rainbow Boulevard, proceeding west to the 215 Beltway which is a distance of approximately six miles. In addition to removing and replacing the pavement on Summerlin Parkway, a much-needed third westbound travel lane will be added from U.S.95 to Buffalo Drive to improve traffic flow.
Traffic lane restrictions will be in effect in work zones according to the following schedule:
- Now through 8 p.m. Monday, May 19: Westbound Summerlin Parkway will be reduced to one lane of travel from Buffalo to Town Center Drive. The westbound off-ramp at Durango and the Rampart on and off-ramps will be closed to traffic. Suggested alternate routes for north-south travel are Buffalo and Town Center. The Durango off-ramp should reopen to traffic at approximately 2 p.m. today. This section of Summerlin Parkway and the associated off and on-ramps on Rampart should reopen by approximately 8 p.m. on Monday, May 19.

- 8 p.m. Monday, May 19 through 8 p.m. Tuesday, May 20: Westbound Summerlin Parkway east of Town Center to the 215 Beltway will narrow to one lane of travel. Westbound on and off-ramps at Town Center and Anasazi Drive will be closed to traffic. To accommodate commute traffic, the Town Center off-ramp will be open from 6 a.m. to 9 a.m. on Tuesday, and will then reopen at approximately 2 p.m. This part of Summerlin Parkway and the Anasazi ramps will reopen by 8 p.m. Tuesday. Durango and Rampart are suggested as alternate routes.

- 8 p.m. Tuesday, May 20 through 8 p.m. Wednesday, May 21: Eastbound Summerlin Parkway will be reduced to one lane of travel from the 215 Beltway to just east of Town Center. The eastbound Anasazi and Town Center on and off-ramps will be closed to traffic. The Anasazi off-ramp will open to traffic at 2 p.m. This part of Summerlin Parkway and the Town Center Drive ramps will reopen by 8 p.m. Suggested alternate routes are Rampart and Durango.
- 8 p.m. Wednesday, May 21 through 8 p.m. Thursday, May 22: Eastbound Summerlin Parkway will be reduced to one lane of travel from east of Town Center to Buffalo. The eastbound Rampart and Durango on-ramps will be closed to traffic. The Durango on-ramp will be open to traffic from 6 a.m. to 10 a.m., and reopened by 4 p.m. No work is scheduled to take place during the Memorial Day holiday weekend
- 8 p.m. Tuesday, May 27 through 8 p.m. Wednesday, May 28: Westbound Summerlin Parkway will be reduced to one lane of travel from Buffalo to Town Center. No access ramps will be affected during this phase of work.
- 8 p.m. Wednesday, May 28 through 8 p.m. Thursday, May 29: Summerlin Parkway will narrow to one travel lane in each direction between the 215 Beltway and Town Center. No access ramps will be affected during this work phase.
- 8 p.m. Thursday, May 29 through 8 p.m. Friday, May 30: Eastbound Summerlin Parkway will be reduced to one lane of travel from west of Town Center to Durango. No access ramps will be affected.
- 8 p.m. Friday, May 30 through 8 p.m. Saturday, May 31: Eastbound Summerlin Parkway will be reduced to one lane of travel from Rampart to Buffalo. No access ramps will be affected.
- 6 a.m. Saturday, May 31 through 8 p.m. Sunday, June 1: Westbound Summerlin Parkway will narrow to one travel lane in each direction from U.S. 95 to Buffalo and the Buffalo off-ramp will be closed.
This improvement project is being managed by the city of Las Vegas Department of Field Operations. Southern Nevada Paving is the contractor. The entire project should be completed on Sunday, June 1.
-end
Return to News Release Index
|

|
 |
|